Standard requirements for construction of cold storage

<

Cold storage construction

The closer the compressor is to the evaporator in the cold storage, the better it is, so it is not only easy to maintain, but also better in heat dissipation. When installing outdoors, pay attention to rainproof. The four corners of the main unit need to be equipped with anti-vibration pads. The horizontal installation is firm, and it is safe to be touched by people.

1. Copper pipe discharge: All copper pipes need to be insulated with the same direction wires and air-conditioned cable ties together. Try to straighten the pipe and fix it in sections. The insulation pipe and the insulation pipe joint are sealed with electric tape.

2. Radiator installation: The installation position of the radiator is as close as possible to the host. It is better to be in the upper position of the main unit. The radiator installation position has a better heat dissipation environment. The suction port cannot be facing the air outlet of other equipment, especially oily gas. The tuyere should not be short-circuited and facing other windows (especially the window where residents live) and equipment, should be 2M high from the ground, and the installation level is firm and shockproof.

3, electrical wire performance configuration: wire diameter to meet the requirements, the joint is firm, need to protect the pipe can not save, the power is correct. The wire enters the hole of the evaporator junction box and needs to be sealed by silicone. If the lamp is 36V or more, the grounding wire is required. The electric power in the cabinet of Xueyi Refrigeration requires three-phase five-wire system, which must be reliably grounded.

4. Refrigeration system connection: Because the main condenser and evaporator are sealed and sealed in the factory, there should be pressure when opening the seal. It can be checked whether there is any leakage. The factory copper pipe should have dust-proof measures at both ends. Pay attention to seal at any time, enter the tube with waterproof dust, condenser → main unit → evaporator, copper tube connection by welding method, the interface is firm and beautiful.

5. Wire discharge: All wires should be protected by corrugated hose or wire trough through the pipe, and the temperature display wire should not be close to the wire.

6. Temperature control probe installation: The probe and the temperature display probe are inserted into the evaporator air return port, and are suspended, the defrosting temperature control is also fixed on the sky plate, and the probe is further perforated into the evaporator air return port, and the probe is inserted into the wing. In the film (cannot be close to the electric heating pipe), Xueyi refrigeration temperature control and defrosting temperature control are fixed in the corner of the evaporator inside the warehouse, and all wirings are sealed.

7. Balance window installation: Do not install in the conspicuous place and the air outlet vertical plate, the height is 200MM opening on the vertical plate.

8. Sealing of the library board: All the parts that penetrate the board, the gap between the board and the parts needs to be sealed with a sealant.